1. Main structure:
The main body is color steel plate and aluminum alloy profile. All the inside and outside corners of the room are made of aluminum alloy 50 rounded aluminum, so as to solve the problems of easy pollution, dust accumulation, and difficulty in cleaning. The structure is firm, the lines are concise, the appearance is elegant, and the sealing performance is good.
2. Standard three-zone separation and air pressure adjustment:
The PCR process was divided into three independent experimental areas: reagent preparation, sample preparation and PCR amplification detection. There is an integral buffer corridor throughout the area. Each independent experimental area is provided with a buffer zone, and at the same time, each area is adjusted by air pressure, so that the reagents and samples are free from aerosol contamination during the entire PCR experiment process, and the contamination of amplification products to personnel and the environment is reduced.
The exhaust fans in buffer zone I, buffer zone II and PCR amplification area can be opened to exhaust air, and return air vents with adjustable air volume are installed on the outer wall of the experimental area and on each door, and the air is ventilated indoors through the air return vents. .
3. Disinfection:
Ultraviolet lamps are installed on the top of the three experimental areas and the three buffer zones and inside the transfer window for disinfection.
Mobile ultraviolet lamps are also set up in the reagent preparation area and the specimen preparation area to locally disinfect the laboratory table.
4. Mechanical interlocking stainless steel transfer window:
Reagents and specimens are delivered through the mechanical interlocking stainless steel (electronic interlocking method is not recommended) transfer window to ensure that reagents and specimens are not contaminated during the transfer process (personal shunting)
5. Ground
It is recommended to use PVC coiled floor or artesian floor for the ground, which has good integrity. Easy to clean and corrosion resistant. Terrazzo floor can also be used without conditions, or large tiles (at least 800mm × 800mm) joints need to be less than 2mm.
6. Lighting
Lamps should be purified lamps, which can achieve the characteristics of easy cleaning and no dust accumulation.
Attention should be paid to the construction process
●Standard installation process and comprehensive service process.
●Strictly follow the standard and scientifically designed installation process.
●Before installation, it is necessary to determine the following installation conditions, such as: power supply voltage, power inlet position, telephone network cable inlet position, inlet water pressure, ground flatness, ventilation holes, water inlet pipe and sewer position, etc. Space dimensions and vent dimensions.